Skip to Content

For HSE, project & welfare managers

Hydration engineered
for construction sites.

Five essential electrolytes plus 500 mg of vitamin C for UAE summer worksites — bulk pouches, sachets and welfare-station kits delivered across the GCC.

A construction worker taking a hydration break under midday sun
1515 Jun–15 SepUAE midday-break window, 12:30–15:00 daily outdoor-work ban
AED5,000MoHRE penalty per worker
55minerals — K · Na · Cl · Ca · Mg per serve

The reality on site

Heat is operational risk — not just a comfort issue.

On a Dubai jobsite in July, surface temperatures on concrete and steel push working conditions past 55 °C. Sweat rates of 1.5–2.5 litres per hour drain sodium, potassium and magnesium that plain water cannot replace.

01

Physiological

Plain water alone dilutes blood sodium and can trigger hyponatraemia — a condition that worsens with more water. Electrolyte replacement is the physiological requirement.

02

Regulatory

MoHRE inspection teams evaluate welfare-station adequacy. Inadequate hydration provision triggers fines, project-suspension orders and main-contractor audits.

03

Reputational

Tier-1 main contractors require sub-contractor welfare-compliance audits. A documented hydration programme is the paper trail that satisfies both MoHRE and ESG reviews.

How Hydralyte fits a worksite

Built for welfare-station deployment.

Hydralyte’s formula restores the sodium-glucose co-transport ratio that drives rapid cellular rehydration — in formats designed for site distribution, from individual toolbox sachets to bulk welfare-station pouches.

Bulk delivery to site

Welfare rooms, labour camps and project stores — pallet-level, on schedule.

48-hour lead time

Pallet-level replenishment across the UAE, all summer.

Distribution-log templates

The paper trail MoHRE inspections ask for — ready before they visit.

Spec sheets

Product documentation for main-contractor and ESG audits.

Formats for this industry

Pick the format that fits your operation.

800 g

Bulk pouches

~160 servings — for welfare stations and central mixing points.

96 box

Sachets — bulk box

96 × 4.9 g sachets — for toolbox kits and roving teams.

MIXED

Mixed pallet

Custom volume — for large multi-zone projects and camps.

Built for UAE summer operations.

Start with a pilot welfare station on one site — most programmes scale to scheduled supply within the month, documentation included.