For HSE, project & welfare managers
Hydration engineered
for construction sites.
Five essential electrolytes plus 500 mg of vitamin C for UAE summer worksites — bulk pouches, sachets and welfare-station kits delivered across the GCC.
The reality on site
Heat is operational risk — not just a comfort issue.
On a Dubai jobsite in July, surface temperatures on concrete and steel push working conditions past 55 °C. Sweat rates of 1.5–2.5 litres per hour drain sodium, potassium and magnesium that plain water cannot replace.
Physiological
Plain water alone dilutes blood sodium and can trigger hyponatraemia — a condition that worsens with more water. Electrolyte replacement is the physiological requirement.
Regulatory
MoHRE inspection teams evaluate welfare-station adequacy. Inadequate hydration provision triggers fines, project-suspension orders and main-contractor audits.
Reputational
Tier-1 main contractors require sub-contractor welfare-compliance audits. A documented hydration programme is the paper trail that satisfies both MoHRE and ESG reviews.
How Hydralyte fits a worksite
Built for welfare-station deployment.
Hydralyte’s formula restores the sodium-glucose co-transport ratio that drives rapid cellular rehydration — in formats designed for site distribution, from individual toolbox sachets to bulk welfare-station pouches.
Bulk delivery to site
Welfare rooms, labour camps and project stores — pallet-level, on schedule.
48-hour lead time
Pallet-level replenishment across the UAE, all summer.
Distribution-log templates
The paper trail MoHRE inspections ask for — ready before they visit.
Spec sheets
Product documentation for main-contractor and ESG audits.
Formats for this industry
Pick the format that fits your operation.
Bulk pouches
~160 servings — for welfare stations and central mixing points.
Sachets — bulk box
96 × 4.9 g sachets — for toolbox kits and roving teams.
Mixed pallet
Custom volume — for large multi-zone projects and camps.
Built for UAE summer operations.
Start with a pilot welfare station on one site — most programmes scale to scheduled supply within the month, documentation included.